8613564568558

Cheap price China Lpt Pit Pile Integrity Tester for Pile Integrity

Short Description:

JB series Hydraulic Walking Piling Rig is famous design for highly integration of electric, hydraulic and mechanic piling rig. It owns completely the Independent Property Rights and has been awarded certificates from Chinese government due to its advanced technology. The rig provides excellent performance, reliable working, is widely used in SMW method (Soil Mixing Wall method). The rig can be attached with diesel pile hammer, pre-bored pre-cast piling equipment, etc. It is suitable for various piling and foundation conditions, such as, elevated highways, expressways, bridges, ports, water docks, metro stations and skyscrapers.


  • FOB Price: US $0.5 - 9,999,999 / Piece
  • Min. Order Quantity: 1 Piece/Pieces
  • Supply Ability: 100 Piece/Pieces per Month
  • Port: Shanghai Port
  • Payment Terms: L/C, D/A, D/P, T/T
  • Product Detail

    Product Tags

    That has a sound small business credit, great after-sales service and modern production facilities, we’ve earned an outstanding standing amid our buyers across the earth for Cheap price China Lpt Pit Pile Integrity Tester for Pile Integrity, We also ensure that your selection will be crafted with the highest quality and reliability. Please feel free to contact us for further information.
    That has a sound small business credit, great after-sales service and modern production facilities, we’ve earned an outstanding standing amid our buyers across the earth for China Pile Test, Pile Integrity Tester, We always insist on the principle of “Quality and service are the life of the product”. Till now, our solutions have been exported to more than 20 countries under our strict quality control and high level service.
    JB170 Hydraulic Walking Piling Rig2

    Product Features
    HYDRAULIC WALKING PILING RIG
    1. MORE EFFECTIVE, STABLE AND DURABLE
    The leader, main platform and walking gear are designed for heavy-duty pile driving, to ensure more stable and effective work.
    Weight carrier of bigger load bearing.

    2. EASY FOR ASSEMBLY AND TRANSPORATION
    Modular structure design, easy for assembly and disassembly.
    Out triggers of the platform with the rotary pin structure, is driven by cylinder, which saves trouble of disassembly. Can be disassembled and transported by parts, easy for transportation.

    3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
    Both main drum and auxiliary drum are under electro-hydraulic proportional control, available for variable speed control and lock any speed.
    Main pump, control valve, pressure gauge, drums are all using domestic and foreign well-known brands.

    4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
    Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
    Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

    5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
    Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
    Hydraulic actuated winch control levers allow well performance and easy control.
    Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

    TECHNICAL PERFORMANCE CHARACTERISTICS OF JB170
    1. JB170 leader can be extended up to 53m, with the ultra-deep ZLD three-shaft Agitating Auger, the maximum construction depth can reach 46m, together with ZLD five-shaft agitating auger, it can drill holes of depth up to 30m.

    2. JB170 contains 8 lifting cylinders, increase site adaptability.

    3. Unique positioning structure design guarantees a self-erect without help of service crane. JB170 can make 53m height.

    4. JB170 hydraulic oil tank enclose with good appearance and prevent excessive shine, Protect oil tank and filter at construction site.

    5. Leader’s inclination angle lift up to 70°, JB170 will set alarm by built-in alarm device (optional), to prevent it excessive tilt.

    6. Removable operator’s room, easy for load and transport, ensure effective work.

    Product Model: JB170
    Specifications

    Item JB170 HydraulicWalking Piling Rig JB170A HydraulicWalking Piling Rig
    Total length of leader (m) 23~53
    Diameter of leader (mm) Ø1120
    Center distance between leader and mounted equipment (mm) 600×ø101.6 1000×ø101.6
    Leader inclination angle (left to right) (°) ±1.5
    Backstay stroke (mm) 2800
    Leader trimming cylinder stroke (mm) 400
    Max. auger model ZLD330/85-5-M3-S
    Max. diesel hammer model D160
    Max. leader length (m) 53
    Max. pulling force (with Max. leader) (KN) 743
    Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 120max
    Winding and rewinding peed (m/min) 0~21
    Rope diameter (mm) ø22
    Drum capacity (m) 750
    Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 110max
    Winding and rewinding peed (m/min) 0~18
    Rope diameter (mm) ø22
    Drum capacity (m) 300
    Swing angle (°) ±10 ±8
    Transverse travel Travel speed (m/min) ≤4.5
    Travel step (mm) 3100
    Vertical travel Travel speed (m/min) ≤ 2.7
    Travel step (mm) 800
    Uplift of the track Speed (m/min) ≤ 0.55
    Height (mm) 450
    Distance between tracks Working (mm) 9100
    Travelling (mm) 4700
    Distance between pulleys in track Working (mm) 5600
    Travelling (mm) 4700
    Transverse-moving track Length (mm) 10130
    Width (mm) 1400/1200
    Vertical-moving track Length (mm) 6900
    Width (mm) 1700
    Connection between outrigger beam and platform Pin rotary, cylinder expanding
    Average ground pressure (MPA) ≤0.1
    Motor power (kw) 45
    Hydraulic crowded system (MPA) 25/20
    Hydraulic crowded system operation Manual & electric control
    Total weight of piling rig (T) ≈175 ≈180

    Note: Specifications are subjected to change without prior notice.

    Application

    HANGZHOU PROJECT Product: Long Auger&JB170

    SHANGHAI PROJECT Product: ZLD330&JB170

    JB170 Hydraulic Walking Piling Rig3
    JB170 Hydraulic Walking Piling Rig4

    Service
    1. FREE-CALL CENTER SERVICE
    We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

    2. CONSULTANCY & SOLUTIONS
    Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

    3. TESTING & TRAINING
    SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.
    We will offer training on site if it is necessary, to make sure you know the correct
    way for maintenance, analysis and debugging of the malfunctions.

    4. MAINTENANCE & REPAIR
    We have offices in many places in China, easy for maintenance.
    Sufficient supplies for spare parts and wearing parts.
    Our service team has a wide range of professional experience on any size project large or small. They provide best solutions with quick response.

    5. CUSTOMERS & CONNECTIONS
    After-sale customer file was set up for better understanding your need and feedback.
    More services are provided, such as, sending info of new released products, latest technology. We also provide special offer for you.

    THE GLOBAL MARKETING NETWORK
    Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


  • Previous:
  • Next:

  • Related Products