The static drilling and rooting method is to use the static drilling and rooting pile planting method to perform drilling, deep mixing and bottom expansion grouting mixing, and finally implant prefabricated piles, which means pre-tensioned prestressed concrete slub piles (PHDC), pre-tensioned Different specifications and models of prestressed concrete pipe piles (PHC) and composite reinforced prestressed concrete pipe Pullis (prhc) sunt combined variis junctiones in occursum consilium requisitis, et peraguntur secundum eundem, imo expansion, grouting, implantatio et aliis processibus. Construction modum de acervum fundamenta. Ex characteres ex constructione modum static dentura et everteret acervum, in acervum corpus potest transire per varios geological interlayers, et acervum diameter est D ~ 1200mm. In praesenti maximam constructione profundum potest pervenire de LXXXV metris subterraneis et ferridam unum machina potest pervenire 300m per diem et oeconomica beneficium est princeps. Nam alia mole genera.
I. Characteres constructione modum
①no solo extrusionem non vibrationem, low strepitu; Solve constructione problems de traditional luto retinens acervum foraminis murum ruina, ypostasis imperium et luto missionem;
② Unique bottom expansion technology, the bottom expansion diameter is 1~1.6 times of the hole diameter, the bottom expansion height is 3 times of the drilling diameter, the pile quality is good, the pile top elevation is completely controllable, and the construction quality is easy to control;
③implant ad prefabricatum acervum in borehole et caementa solo solidatur formare cemento solo-involvit rigida struem corpus et externum caementa slurry habet significant tutela effectum in acervum corpus

④estremely fortis verticalis compressionem, Pullout et horizontali onus resistentia;
Per usum variis genera ut quisque bamboo acervos et compositum roborari, tum deorsum expansion et grouting artes, in compressionem, Pullout et horizontalem afferentem facultatem acervum fundamenta sunt valde melius;
⑤ Energy salvis et environmental tutela;
Comparari terebravisse acervos sub eadem conditionibus constructione aqua salute XC%, industria consummatio salute XL%, lutum reducendo LXX%, constructione efficientiam crescente L%, cost salute X% ~ XX%;

⑥diversified consilio;
Secundum accentus characteres de acervos, diversis acervum genera potest compositae, ut sequitur:

2.Process principle

Foramen formatam processus mixtionem terebro tibia et augurem terebro tibia in siccis operationem adoptatur, foraminis est Design secundum consilium profundum, ac mole finitus vicem secundum consilium magnitudine (diameter finem). Postquam reaming perficitur, struem finem cemento slurry et caementa slurry circa acervum est Dominus cum grouting. Postquam EXERCITATIO perficitur, acervum implantatum consilium gradu per se-pondus struem et struem tip et caementa slurry circa struem solidatae, ut struem et tincidunt et caementa, ut struem tincidunt et caementa et struem et tincidunt. Formare corpus et portare portantes simul.
III. Construction processus
Et stabilis dere et everteret acervum constructione modum est ut a speciali SDP EXERCITATIO rig ad terebram foramina secundum consilium requisita. Imo foraminis est agnoscitur secundum disposito diameter et altitudo. Lift the drill, and after the grouting is completed, rely on the self-weight of the pile to implant the pile into the design elevation, and solidify the cement slurry at the pile end and around the pile, so that the pile and the solidified soil are integrated. Et afferentem facultatem de acervos maxime adeptus per acervum parte friction et acervus tip resistentia. The static drilling and rooting pile construction method increases the bearing capacity of the pile tip by expanding the bottom of the pile tip, and increases the frictional resistance of the pile side by injecting cement slurry into the pile side, which can give full play to the advantages of high strength of the prefabricated pile body and improve the bearing capacity of the foundation pile.

Construction Steps:
EX EXERCITATIO: EXERCITATIO rig positus, eligendo oportet exercitium celeritas secundum geological conditionibus, in EXERCITATIO processus, injiciunt aquam aut Bentonite mixtum secundum geologicum conditionibus, torulo foraminis corporis protegens murum;
Solum expansion postquam adoletur perficitur imo acervum aperitur terebro foramina expand ad cornu per professionalem moderabulum hydrau technology et imo dilatatur in fractione secundum expansionem cornu diam. Et per administratione fabrica ad monitor imo expansion situ in ipsa tempore;
Pugna finem cemento slurry iniectio: post imo expansion perficitur, struem finem caementa slurry infusum, et exercituum rig est saepe expansion partibus infunduntur et struem finem caementa slurry est uniformis;
Iniectio de caemento slurry circa acervum et trahens de terebro: post iniectio caementa slurry in acervum finem, satus ad trahendum de terebro tibia, injiciunt saepius;
Acervam plantabant et acervum partus: post exercituum rig trahit omnes terebro tibia, satus plantarum. Per acervum plantationis processus, monitor aliquo tempore ut verticality struem et curare profundum profundum acervum plantabant;
Shift: Movere ad proximum acervum positus et repetere super gradibus;
Quartum, in scope of application ex constructione modum
①sitable pro afferentem vertical compressionem, Pullout et horizontali onerat;
② cohaerentis solo, silt, Sandy solo, saturitas solo, oppressi (glaeba) rupes, et petra formations cum complexu geological condiciones, multos interlayers et mollitie;
③When sunt aedificia (structuris) et subterraneis pipelines et alius Engineering facilities prope constructione site, solo premezing effectus necessitates ad imperium;
④ solo qualis est difficile ad terebravisse acervos ad formam foramina, ut crossior harenae et calculo interlaers vel silic solo cum altum humorem content (terra reclamation);
⑤ et profundum afferentem stratum variat vehementer, et difficile est iudicare stratum; Et mollis solo fundamenta, fundamentum sine idoneum afferentem stratum;
⑥ Sunt vetus acervum fundamenta sub terra et slag iacuit plus quam III metris backfilled super superficiem.
V. Static EXERCITATIO et everteret modum apparatu
In stabilis dxium et everteret modum apparatu est maxime constructione modum exercituum rig cum acervum frame. Initio, quod est usus cum uno-track artus pro constructione, quae requiritur multiple additiones terebro tibia, et constructione efficientiam esse humilis. Nunc autem plerumque instructa cum duplici-track acervus frame, et duo constructione modum dentura rigs suspendantur simul. EXERCITATIO alternatim quondam polus adhibetur, profundum potest pervenire 85m, quod magna amplio constructione efficientiam.

In static driving et everteret modum apparatu adoptat intelligentes constructione administratione software ad monitor in constructione processus in realis tempus ut constructione qualitas. Variis constructione notitia sunt scilicet reflectitur in ostentationem et reposita automatice.

EXERCITATIO frenum adoptat Advanced oleum pressura fundum expansion technology, imo expansion diameter est I ~ 1.6 tempora ex diametro, et imo expansion altitudo est III tempora diam Secundum diversis Geological Conditions, constructione potest eligere generali proposito terebro vel specialis terebro;
Universalis EXERCITATIO frenum, idoneam ad Sandy solo

Special Tercula:

In annis, in stabilis diam everteret modum est late in Shanghai, Ningbo, Hangzhou et Cividium ambiente, providing magis electiones pro acervum fundamenta constructione et ad constructionem specifications et technica signa et related unum ad alium et technical signa et ad constructionem et technica et secundum alium. Novum genus acervum fundamenta constructione modum quod est viridis et environmentally amica, habet altus constructione efficientiam et bonum acervum, formatam effectus, et dignum est longius promotionem.
Post tempus: Aug-11-2023