Team fight! 13 sets of TRD construction machines of SEMW were working at the same time, and the scene was so spectacular!

Overcome difficulties, stop water seepage 

13 SEMW series TRD construction machines work together 

What kind of experience is it? 

Watch the live video to find out

Expedition to Xiongan New Area

Assist in the construction of Xiongxin high-speed railway

SEMW's 13 TRD construction machine assembly team battle 

Reproduce the green color on the field 

handsome this one 

SEMW is very tight 

Of course, being handsome is only on the outside 

Inside is where the real strength lies!

SEMW

Xiongxin high-speed railway project, here siphons high-quality resources of national infrastructure construction. The civil engineering and related supporting works of the underground section of Xiong'an New District of Xiongxin high-speed railway participating in the construction project are about 30 kilometers long. The total construction cost of TRD multi-section water-stop curtain diaphragm wall required The volume is about 500,000 square meters, the thickness of the wall is 800mm, and the depth of the wall is 27m-40m. The project volume is huge. A total of 28 TRD construction machines were assembled at the same time, including 8 sets of China Railway Third Bureau, 7 China Railway Fifth Bureau, and China Railway Seventeen There are 7 units for China Communications Engineering Bureau, 2 units for China Communications Second Harbor Engineering Bureau, and 4 units for China Railway Construction. They worked together on site with great momentum to carry out the construction task of multi-section water-stop curtain diaphragm wall stably, efficiently and accurately, and the scene was spectacular.

semw1
semw2

It is worth mentioning that in this construction project, SEMW occupies half of the country and gathers 13 TRD series construction machines, which are scattered on different foundation pit fronts with a length of 30 kilometers. Due to their excellent performance on site, they have also become Synonymous with "efficiency, stability, and peace of mind" on site, it is affectionately called "Mr. Key" in construction operations by operators.

semw3
semw4

Why is there the largest number of TRD construction machines on site?

"Powerful performance, the highest construction efficiency in the field" 

The Xiongxin high-speed railway project has high environmental protection requirements, complex geological conditions, and extremely difficult construction. During the construction process, the Xiongxin high-speed railway will adopt a large number of elevated crossings and tunnels. The total length of bridges and tunnels accounts for 93.8% of the entire length of the line, and it will do its best to protect cultural heritage and maintain the ecological environment.

semw5
semw6

On the construction site, the safety, efficiency, stability, cutting capacity, energy saving and environmental protection of TRD construction machine equipment are all very important, and it is also necessary to have the ability to deal with emergencies on the construction site. 

"SEMW's TRD construction method machine is really powerful. The site is mainly for the Baigou River (a part of the river adjacent to the tunnel is buried by wasteland, farmland and green belts), and the geological conditions are complex. SEMW's equipment can always handle it easily. , the depth of the wall is 27-40m, the advance excavation speed is 2m-3m/h, the retraction excavation speed is 8m/h, and the wall-forming stirring speed is 2.4m/h." Nearly 20 hours of work per day, equipment non-stop, failure The production rate was very low, the personnel worked in two shifts, and there were a lot of walls. The operator on site gave a thumbs up and praised, "It's nothing to say, we can rest assured that we can use SEMW equipment."

At present, the on-site construction machinery TRD construction method machine relies on its strong product performance. The single-unit construction on site has the largest amount of wall volume, the lowest failure rate of a single device, and the highest construction efficiency in the field.

semw7
semw8

How does SEMW TRD site become the "Mr. Key" of construction?

"Compared with other brands before, SEMW is much better." 

For SEMW's TRD construction method machine, Master Wang, the operator who just joined the job at the construction site in February this year, also has his own experience. "Since I came to the Xiongxin high-speed rail project to contact SEMW and equipment for more than 2 months, our machine has not had any problems. It cuts smoothly, the sound is quiet, and it is much more comfortable to drive. SEMW is worthy of Thumbs up in the TRD industry!" 

Equipped with an integrated cab, super large space, ultra-quiet, air-conditioned, and all control elements within easy reach, SEMW TRD construction machine creates the best operating environment for operators.

semw9

In addition to the excellent performance of the equipment, SEMW’s TRD construction machine service point has been set up in the center of the field. The on-call after-sales service is the icing on the cake. The construction machinery TRD construction method machine is also based on the low failure and high efficiency brought by this advantage, and is affectionately called "Mr. Key" in construction operations by the machine operators. 

At the same time, in the face of such a huge project, Gong Xiugang, the general manager of SEMW, also came to the hot construction site to have close-distance and in-depth conversations with the general contractor, customers and front-line operators.

semw10

Helping the construction of the Xiongxin high-speed railway, under the wave of new infrastructure construction, SEMW will take on the big responsibility and move forward with great strength, and SEMW will follow the pulse of the times and play the strongest voice! 

In order to solve the needs of users and provide overall construction solutions, it has always been the motivation and unremitting pursuit of SEMW workers. Responsibility and responsibility coexist, quality and innovation coexist. SEMW produces every product with ingenuity and serves every customer with care. Customers, do our best to help the construction of national urban infrastructure and create more value for customers!