8613564568558

Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We generally believe that one's character decides products' top quality, the details decides products' high-quality ,along with the REALISTIC,EFFICIENT AND INNOVATIVE team spirit for Dra220 Dual Power Drilling Rig, Rig Machine For Piling Manufacturer, Pile Driving Analyzer Supplier, The main goal of our company would be to live a satisfactory memory to all of the shoppers, and establish a long term company romantic relationship with customers and users all around the entire world.
Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery Detail:

DAG series steel column implantation equipment is a new type of steel column construction equipment, which is mainly used for deep excavation, soft ground excavation and construction close to buildings. DAG series steel column implantation equipment is equipped with two sets of wedge-shaped hydraulic clamping device and high precision vertical control system, which can not only im;lant steel column into concrete before initial setting, but also plant steel column before pouring concrete. One equipment can easily arrange two kinds of steel column construction technology, which solves the shortcomings of traditional steel column construction supporting equipment, low precision, high cost, slow efficiency and so on.

 

MAIN FEATURES

  • The main machine is light in weight and has lower requirements for supporting cranes.
  • Wedge-block clamping, the main and auxiliary clamping device is the same as the wedge-shaped clamping device made for CNC machine tools, and the coaxial precision is higher.
  • The industry pioneered the technology of three-cylinder pair clamping, and the linkage state is highly synchronous.
  • No auxiliary clamping platform is needed for construction, and the vertical accuracy of steel column implantation is increased by 20%.
  • Electrically driven hydraulic power system, low noise, low energy consumption, environmental protection and economy.
  • With wireless control system, the operator can monitor the whole process of steel column implantation without dead angle in the range of 0-50m.

4 15 16 23 24

 


Product detail pictures:

Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery detail pictures


Related Product Guide:

Being supported by an state-of-the-art and skilled IT team, we could supply technical support on pre-sales & after-sales service for Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery, The product will supply to all over the world, such as: Buenos Aires, Philadelphia, Pakistan, Our solutions are widely recognized and trusted by users and can meet continuously changing of economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
  • Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Julia from Iraq - 2018.11.22 12:28
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Rebecca from Korea - 2017.04.08 14:55

    Related Products