Trench cutting Re-mixing Deep wall method (TRD for short) is different from Soil Mixed Wall method (SMW). With TRD method, the chain saw tools are mounted on a long rectangular section “cutting post” and inserted into ground, to be moved transversely for cutting and grout pouring, mixing, agitating, and consolidation of soil at the original location, so as to make an underground diaphragm wall.